Verwaltungsleistungen suchen
Bitte geben Sie einen Ort (oder Postleitzahl) an, in dem Sie die Leistung suchen.
Ort suchen
Soil extraction permit
The permit requirement for the extraction of mineral resources arises as follows: in the case of mineral resources under mining law from the Federal Mining Act (BBergG). The...
Your responsible authority
Organisationen Marburg-Biedenkopf - Fachdienst Bauen
- Straße:
- Im Lichtenholz 60
- PLZ Ort:
- 35043 Marburg, Universitätsstadt
-
More information
Opening hours
Monday to Friday from 08:00 to 14:00 and by appointment.
Please note any exceptions within individual areas or for certain services provided by the district administration.
For services provided by the vehicle registration and driver's license authorities, an online appointment system is available. online appointment booking is available.Accessibility
Elevator available: No
Wheelchair accessible: Yes -
Other responsible authority
-
Regierungspräsidium Gießen - Abteilung IV - Umwelt
Contact
- Straße:
- Landgraf-Philipp-Platz 1 - 7
- PLZ Ort:
- 35390 Gießen, Universitätsstadt
- Straße:
- Postfach:
- Postfach 10 08 51
- PLZ Ort:
- 35338 Gießen, Universitätsstadt
- Straße:
- Marburger Straße 91
- PLZ Ort:
- 35396 Gießen, Universitätsstadt
- Telefon
- +49 641 303-0
- Fax
- +49 641 303-2197
- pressestelle@rpgi.hessen.de
- WWW Adresse
- https://rp-giessen.hessen.de
Accessibility
Elevator available: -
Wheelchair accessible: -
-
Regierungspräsidium Gießen - Abteilung IV - Umwelt
-
Detailed description
The permit requirement for the extraction of mineral resources arises as follows:
- in the case of mineral resources under mining law from the Federal Mining Act (BBergG). The mineral resources under mining law are listed in § 3 paras. 3 and 4 BBergG.
- for all other mineral resources
- if a body of water is produced or substantially altered during mining from:
the Water Resources Act (WHG). - if dry degradation,
- the mining area is more than 10 ha in size or is blasted from the
Federal Immission Control Act (BImSchG), - the mining area is less than 10 ha in size and is not blasted from the
Hessian Building Code. According to this, the dismantling requires a building permit,
if the depth exceeds 2 meters or the excavation area in the built-up area
Indoor area is larger than 30 m² or outdoors larger than 300 m².
- the mining area is more than 10 ha in size or is blasted from the
- if a body of water is produced or substantially altered during mining from:
In all cases, as a rule, a nature conservation intervention permit is required in accordance with the Hessian Act on Nature Conservation and Landscape Management (Hessian Nature Conservation Act - HENatG).
Special notes for - Administrative District Marburg-Biedenkopf
-
Point of contact
Contact persons are the district committees or magistrates of the district-free cities as lower building authorities, in all other cases the regional councils as mining authorities or as upper water authorities or as immission control authorities.
-
Legal basis
- Federal Mining Act (BBergG)
- Water Resources Act (WHG)
- Federal Immission Control Act (BImSchG)
- Hessian Building Code (HBO)
- Hessian Nature Conservation Act - HENatG)