Notify construction, significant modification or measures with a change in the hazard level of heating oil consumer systems in accordance with AwSV
If you wish to install or significantly modify a heating oil consumer system or take measures that result in a change in the hazard level, you must notify us.
Your responsible authority
Kreisverwaltung Plön - Abteilung Bauaufsicht
- Straße:
- Hamburger Straße 17-18
- PLZ Ort:
- 24306 Plön
-
More information
Contact
- Telefon
- +49 4522 743324
- Telefon
- +49 4522 743159
- Fax
- +49 4522 74395555
- bauamt@kreis-ploen.de
- WWW Adresse
- https://www.kreis-ploen.de/
Opening hours
Opening hours Building Office
Monday 09.00 - 12.00
Tuesday 09.00 - 12.00 14.30 - 18.00
Wednesday 09.00 - 12.00
Thursday 09.00 - 12.00
Friday 09.00 - 12.00
You are also welcome to make an appointment with us outside office hours by telephone!Accessibility
Elevator available: Not specified
Wheelchair accessible: Not specified -
Other responsible authority
-
Kreisverwaltung Plön - Abteilung Wasser, Bodenschutz und Abfallüberwachung
Contact
- Straße:
- Hamburger Straße 17-18
- PLZ Ort:
- 24306 Plön
- Telefon
- +49 4522 743303
- Fax
- +49 4522 74395303
- umweltamt@kreis-ploen.de
Accessibility
Elevator available: -
Wheelchair accessible: -
-
Kreisverwaltung Plön - Abteilung Wasser, Bodenschutz und Abfallüberwachung
-
Detailed description
You must submit your notification of the installation, significant modification or change to the hazard level of a heating oil consumer system to the competent authority in good time beforehand. The installation of these systems does not have to be notified if
- a suitability assessment has been applied for for this installation in accordance with the Water Resources Act or
- the installation is the subject of an approval procedure under other legislation, provided that the approval procedure also ensures compliance with the requirements of this Ordinance. In this case, significant changes to the installation that require approval are also not subject to notification.
-
Requirements
The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.
-
Documents
- Completed notification form
- Detailed documents describing the project (site plan, drawings, certificates, descriptions)
- Expert opinion, if applicable
-
Fees
Fee: (variabel)
Vorkasse: Nein -
Process
If you want to place the ad online:
- You submit the notification via the online service.
- The water authority will check your documents for completeness and request any missing information or documents.
- The content requirements are also checked, which may also result in additional requirements.
- The authority may temporarily or definitively prohibit the project or issue a decision with conditions.
If you wish to submit the notification by letter or e-mail:
- You fill out the forms required for the notification and send them to the competent authority.
- The further procedural steps correspond to the online procedure.
-
Deadline
Send the notification to the competent authority at least six weeks in advance.
-
Responsible authority
In Schleswig-Holstein, the lower water authorities of the districts or independent cities are responsible.
-
Point of contact
Special notes for - Administrative district Plön
Here you will find the Plön district building inspectorate staff responsible for you. - Legal basis
-
Approved
Ministry for Energy Transition, Climate Protection, Environment and Nature of the State of Schleswig-Holstein
-
Approved date
05.07.2023