Notify construction, significant modification or measures with a change in the hazard level of heating oil consumer systems in accordance with AwSV

If you wish to install or significantly modify a heating oil consumer system or take measures that result in a change in the hazard level, you must notify us.

Your responsible authority

Kreisverwaltung Plön - Abteilung Bauaufsicht

Straße:
Hamburger Straße 17-18
PLZ Ort:
24306 Plön
  • Detailed description

    You must submit your notification of the installation, significant modification or change to the hazard level of a heating oil consumer system to the competent authority in good time beforehand. The installation of these systems does not have to be notified if

    • a suitability assessment has been applied for for this installation in accordance with the Water Resources Act or
    • the installation is the subject of an approval procedure under other legislation, provided that the approval procedure also ensures compliance with the requirements of this Ordinance. In this case, significant changes to the installation that require approval are also not subject to notification.
  • Requirements

    The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.

  • Documents
    • Completed notification form
    • Detailed documents describing the project (site plan, drawings, certificates, descriptions)
    • Expert opinion, if applicable
  • Fees

    Fee: (variabel)
    Vorkasse: Nein

  • Process

    If you want to place the ad online:

    • You submit the notification via the online service.
    • The water authority will check your documents for completeness and request any missing information or documents.
    • The content requirements are also checked, which may also result in additional requirements.
    • The authority may temporarily or definitively prohibit the project or issue a decision with conditions.

    If you wish to submit the notification by letter or e-mail:

    • You fill out the forms required for the notification and send them to the competent authority.
    • The further procedural steps correspond to the online procedure.
  • Deadline

    Send the notification to the competent authority at least six weeks in advance.

  • Responsible authority

    In Schleswig-Holstein, the lower water authorities of the districts or independent cities are responsible.

  • Point of contact
    Special notes for - Administrative district Plön
    Here you will find the Plön district building inspectorate staff responsible for you.
  • Legal basis
  • Approved

    Ministry for Energy Transition, Climate Protection, Environment and Nature of the State of Schleswig-Holstein

  • Approved date
    05.07.2023