Leistungen A-Z
Bitte geben Sie einen Ort (oder Postleitzahl) an, in dem Sie die Leistung suchen.
Ort suchen
Permission to carry out measures on monuments
If you are planning measures or changes to monuments, you need a permit from the responsible monument protection authority.
Your responsible authority
-
Forms
Forms: Application
Online procedure possible: yes
Written form required: partial
Personal appearance required: no
-
Detailed description
Do you want to repair, modernize, redesign, change or otherwise interfere with the monument inventory? This requires a permit from the lower monument protection authority.
If you are planning measures requiring a building permit in accordance with the Brandenburg Building Code, the lower monument protection authority will be involved in the building permit procedure via the building supervisory office. In this case, the building permit automatically includes a modification permit from the competent monument protection authority.
-
Requirements
You will usually receive approval if:
- the requested measure is to be carried out in accordance with the principles of monument preservation, or
- public or private interests that conflict with the interests of monument protection predominate and these cannot be taken into account in any other way or only with disproportionate effort (cf. § 9 para.2 BbgDSchG).
-
Documents
Each measure must be described in detail. You should submit all documents that contribute as comprehensively as possible to the assessment of your project. These can be:
- Plans (e.g. location, floor plans, elevations, sectional representations)
- Documentation
- Photographs
- Expert opinions or preliminary investigations
- Cost and profitability calculations
Note: Contact the lower monument protection authority at an early stage. This will tell you which documents are required for your approval process.
-
Fees
none
-
Process
- Either fill out the application online or print out the PDF form.
- Include all the necessary documentation.
- Submit the application documents to the responsible lower monument protection authority in good time before the start of the planned measures.
- You will then receive the approval or, if applicable, information about the rejection of your application by post.
-
Duration
depending on the effort and scope of the planned measure
-
Deadline
Expiry of the permit if construction does not begin: 4 years after approval
(one-time extension of up to 2 years upon written request)
-
Responsible authority
In the state of Brandenburg, the lower monument protection authority of the districts and independent cities is responsible
- Legal basis
-
Pointer
If you want to install advertising installations on monuments, you also need a permit.
-
Approved
Ministry of Science, Research and Culture of the State of Brandenburg
-
Approved date
06.07.2023