Change of use of monuments Approval

Are you planning to change the previous use of your monument in order to make better use of it?

Your responsible authority

Please enter a town (or postcode) where you are looking for the service search place
  • Forms

    Forms: Application
    Online procedure possible: partially
    Written form required: partial
    Personal appearance required: no


  • Detailed description

    In the case of monuments, there is a public interest in their preservation in their original form. Thus, changes of use must always be coordinated in advance with the responsible body or approved by it.

    Hint:
    If a building permit is required for your project, the admissibility of a change of use will be checked as part of the building permit procedure.

  • Requirements

    You will usually receive approval if:

    • the measures are carried out according to monument preservation principles or
    • overriding private or public reasons must be taken into account.
  • Documents

    Each measure shall be described in detail. You should submit all documents that contribute as fully as possible to the assessment of your project. These can be:

    • Plans (e.g. location, floor plans, views, sectional representations)
    • Documentation
    • Photographs
    • Expert opinions or preliminary investigations
    • Cost and profitability calculations

    Note: Contact the lower monument protection authority in good time. This will inform you which documents are required for your approval procedure.

  • Process
    • Fill out the application either online or print out the PDF form.
    • Attach all necessary documents.
    • Submit the application documents to the responsible lower monument protection authority in good time before the start of the planned measures.
    • You will then receive the approval or, if necessary, information about the rejection of your application by post.
  • Duration

    4 weeks after submission of the complete application documents

  • Deadline

    Expiry of the authorisation

    • if construction does not start: 4 years after approval
    • in the event of a construction interruption of more than 2 years

    (one-time extension of up to 2 years upon written request)

  • Responsible authority

    In the state of Brandenburg, the lower monument protection authorities of the districts and independent cities are responsible

  • Legal basis
  • Approved

    Ministry of Science, Research and Culture of the State of Brandenburg

  • Approved date
    16.06.2021