Administrative services A-Z
Please enter a town (or postcode) where you are looking for the service
search place
Acceptance of mobile structures
Acceptance of Flying Structures
Your responsible authority
-
Forms
The original test book shall be submitted. An on-site appointment is required for acceptance.
-
Detailed description
Floating structures are structures that are suitable and intended to be repeatedly erected and dismantled in different places (e.g. rides, tents, etc.). For the erection and use of mobile structures, a so-called execution permit is required.
-
Requirements
Use is permitted if:
a) the conformity of the flying structure with the blueprints,
(b) compliance with the ancillary provisions of the execution permit;
c) the stability of the mobile structure with regard to the local ground conditions
can be confirmed.
-
Documents
Display for acceptance of use
Test book of flying construction
Site plan / seating plan (if applicable)
-
Fees
Time fee
According to subheading 6.5 of the Brandenburg Building Fee Regulations
Imposition of conditions or prohibition in accordance with subheadings 6.6-6.7 of the Brandenburg Building Fees Regulations
100-250€
-
Process
The test book must be submitted to the building inspectorate before acceptance of the mobile structure in use. Subsequently, the acceptance date must be agreed with the building supervision. The notifying operator or the operator of the flying structure or the person authorised in writing must personally participate in this.
-
Duration
1 week
-
Deadline
The acceptance of use is valid for the indicated duration of the installation.
-
Responsible authority
The locally competent lower building supervisory authority.
-
Legal basis
§ 76 Brandenburg Building Code
§ 20 Construction Testing Ordinance
Administrative regulation on execution permits for mobile structures and their acceptance tests for use
-
Approved
Ministry of Infrastructure and Regional Planning Brandenburg
-
Approved date
01.06.2022