Administrative services A-Z

 

Please enter a town (or postcode) where you are looking for the service

 
Please enter a town (or postcode) where you are looking for the service
search place

Applying for a pavement crossing

For the construction of the property access, you submit a written application to the responsible road construction authority (municipality / district / state).

Your responsible authority

Please enter a town (or postcode) where you are looking for the service search place
  • Forms

    Written form required: yes

    Personal appearance: not required


  • Detailed description

    For the development of a property, the creation of a property access road is necessary. For the construction of the property access, structural interventions in the existing road body and sidewalk are usually necessary. These structural interventions can be, for example, lowering the board, interrupting the trench for road drainage, piping the ditch for road drainage, adjustments to the sidewalk / cycle path.

    For the construction of a property access road, you must submit an application with a short textual description and/or justification of the project to the responsible road construction authority (municipality, district, state).

    If the construction of a 2nd property access road is applied for a property, this requires a justification of necessity by the applicant, since a property with an access road is sufficiently developed.

  • Requirements

    Applicant is property owner or agent

  • Documents

    Submit an application via form service, form (download) or in writing informally

    Site plan or sketch with indication of the location and dimensions (width, depth) of the planned access road

  • Fees

    Fees for preparation approval: amount of fees based on the StrVwGebO,

    Fee for special use permit: LSonGebV, BSonGebV, municipal statutes if applicable

    Costs for the construction of the access to the property

  • Process

    If available, submit the application via a form service or a form (download). To do this, download and fill out the form (online). If no form service or form (online) is available, make a written request.

    Attach the required documents to the application.

    Submit the application documents to the responsible road construction authority (municipality, district, state).

    You will then receive the approval or a justification for the rejection of your application by post.

  • Duration

    3 months

  • Responsible authority

    Responsible road construction authority (municipality, district, state)

  • Point of contact

    Municipality (Civil Engineering Office)

    District (Civil Engineering Office)

    Land (Landesbetrieb Straßenwesen)

  • Legal basis
  • Approved

    Ministry of Infrastructure and Regional Planning Brandenburg

  • Approved date
    15.02.2023